Your data stays yours. Regulators see what you approve, nothing more.
Everything on this portal is encrypted with your company key. Government and bank nodes receive only the verified aggregate signals you authorise. Our servers cannot read your raw operational data.
94/100
Your Compliance Score
FQM Kansanshi · Top decile
5.4%
Your Current Loan Rate
$22M/yr below market
$18.4M
Royalty Due This Quarter
Payment in 23 days
0
Pending Compliance Flags
All regulators clear ✓
One-Click Filing
Replace 5 separate submissions with one click
Under MRCA 2024, you're required to report to MRC, ZEMA, ERB, ZRA, and ZCCM-IH separately. Resource Command files all five simultaneously from one verified data submission. No duplicate entry. No paper.
Q1 2026 Compliance Package
Period: Jan 1 – Mar 31, 2026 · Status: Ready for submission
Privacy Cockpit
What can regulators actually see?
Live audit of your data permissions. The platform enforces these boundaries cryptographically — no policy override possible without your keyshare.
Your Internal Data (YOU ONLY)
Raw ore grade per deposit (commercially sensitive)
Daily production tonne-by-tonne logs
Cost of production per tonne breakdown
Equipment maintenance schedules
Exploration geological survey data
Off-take contracts & pricing arrangements
Employee headcount and salary data
🔒
ZK
Filter
Regulators & Banks Receive
Royalty paid — amount, date, ZK-verified ✓
Quarterly aggregate production (tonnes)
Energy consumed from ZESCO grid (kWh)
ZEMA environmental status (clear / flagged)
License compliance score (composite index)
Safety incident count + severity tier
Nothing else — enforced by MPC protocol
Digital Twin
Your Mine — Real-Time Operational Heartbeat
A physics-based digital twin of Kansanshi mine. Sensor data streams through PUF-attested IoT devices every 60 seconds. SCADA-connected. Internal View Only
2,847t
Ore Extracted Today
34.2%
Recovery Rate
148 MW
Energy Draw (Grid)
64 MW
Onsite Solar Output
94
Compliance Score
$9,240
Revenue/Hour (est.)
12
Active Haul Trucks
0
Safety Incidents (30d)

Hourly Production Rate (t/hr)

Energy Mix Live

Energy AI
Load Shift Recommendations — Cut Energy Costs 18–30%
AI analyses ZESCO's hourly tariff schedule and your operational flexibility. Heavy loads (mills, pumps) are scheduled for off-peak hours. Shows forecast vs actual energy cost.
$618K
Estimated cost (unoptimised)
$451K
AI-optimised cost (this week)
-27%
Cost reduction achieved
Hourly ZESCO Tariff (peak = red, off-peak = green) — Your load schedule shown as overlay
 AI Recommendation: Shift SAG mill run from 08:00-12:00 to 22:00-02:00. Shift primary pump from 16:00 to 01:00. Combined saving on this week's schedule: $167K. Estimated annual impact: $8.7M.
Royalty Pre-Calculator
Know your royalty obligation before it's due
Real Zambia royalty formula: base rate 5% for copper <$4,500/t, 6% $4,501-$6,000, 7.5% above $6,000 (MRCA 2024 Schedule II). Input your quarter — see what you owe.
Compliance Score Builder
Actions that raise your score — and lower your bank rate
Every point on your compliance score translates to ~0.046% lower interest rate. Here's exactly what you need to do to improve. Click any item to mark as complete.
94
Current Score: 94 / 100
Unlocked rate: 5.40% · At 100: 5.14% · Saving: +$1.3M/yr